Project Details
This page displays current information for project DEA: 040P9204.
Project Information
| Project Identifiers | Project ID: 995254 DEA: 040P9204 EFIS: 0418000026 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-680-6.4/6.6 |
| Award Date | 12/20/2024 |
| Closeout Date | Not set |
| Work Description | HMA AND RHMA SURFACING, DECK REPAIR, POLYESTER OVERLAY AND JOIN SEALS |
| Location Description | ALAMEDA COUNTY IN FREMONT FROM 0.1 MILE SOUTH OF MISSION SAN JOSE 680/238 SEPARATION TO 0.3 MILE NORTH OF MISSION SAN JOSE 680/238 SEPARATION |
| QA Service Level | 1 (Verified on 10/17/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| scott.sowko@dot.ca.gov | Scott Sowko | Resident Engineer | Caltrans RE DB |
| jordan.jarosz@dot.ca.gov | Jordan Jarosz | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 26 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-10-33 | 08/10/2025 | 08/10/2025 | Quality Control | Concrete | View |
| 2025-08-10-32 | 08/10/2025 | 08/10/2025 | Quality Control | Concrete | View |
| 2025-08-09-26 | 08/09/2025 | 08/10/2025 | Quality Control | Concrete | View |
| 2025-08-09-25 | 08/09/2025 | 08/10/2025 | Quality Control | Aggregate | View |
| 2025-07-26-18 | 07/26/2025 | 07/27/2025 | Quality Control | Aggregate | View |
| 2025-07-26-17 | 07/26/2025 | 07/27/2025 | Quality Control | Concrete | View |
| 2025-07-26-16 | 07/26/2025 | 07/27/2025 | Quality Control | Concrete | View |
| 2025-07-26-15 | 07/26/2025 | 07/27/2025 | Quality Control | Concrete | View |
| 2025-07-09-134 | 07/09/2025 | 07/09/2025 | Quality Control | Concrete | View |
| 2025-08-12-114 | 08/12/2025 | 08/22/2025 | Production Start-Up | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
