Project Details
This page displays current information for project DEA: 060W9104.
Project Information
| Project Identifiers | Project ID: 995239 DEA: 060W9104 EFIS: 0618000011 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-27.6/30.6 |
| Award Date | 09/17/2024 |
| Closeout Date | Not set |
| Work Description | HMA, RHMA-G, JOINTED PLAIN CONC PVMT (RSC) AND STBB (TYPE M). |
| Location Description | TULARE COUNTY IN AND NEAR TULARE FROM PAIGE AVENUE OVERCROSSING TO PROSPERITY AVENUE OVERCROSSING. |
| QA Service Level | 1 (Verified on 10/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| amir.zamanian@dot.ca.gov | Amir Zamanian | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 112 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-22-65 | 09/22/2025 | 10/29/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-09-25-86 | 09/25/2025 | 10/24/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-10-08-63 | 10/08/2025 | 10/24/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-10-07-67 | 10/07/2025 | 10/24/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-10-06-67 | 10/06/2025 | 10/24/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-09-08-45 | 09/08/2025 | 09/26/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-09-09-68 | 09/09/2025 | 09/26/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-09-21-7 | 09/21/2025 | 09/26/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-09-17-62 | 09/17/2025 | 09/26/2025 | Quality Assurance | Asphaltic Emulsion | View |
| 2025-06-19-23 | 06/19/2025 | 06/18/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
