Project Details
This page displays current information for project DEA: 07355404.
Project Information
| Project Identifiers | Project ID: 995229 DEA: 07355404 EFIS: 0719000010 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2,210-15.0/57.5,R18.7/R19.4 |
| Award Date | 01/30/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE AND INSTALL DRAINAGE SYSTEM, AND PERFORM SLOPE PAVING. |
| Location Description | LOS ANGELES COUNTY ON ROUTE 2 FROM 1.0 MILE NORTH OF CLIFFORD STREET TO MOUNT WATERMAN SKI LIFTS AND ON ROUTE 210 FROM 0.5 MILE EAST OF OCEAN VIEW BOULVEARD OVERCROSSING TO 0.2 MILE EAST OF ALTA CANYADA ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 10/19/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| danglong.M.Tran@dot.ca.gov | Bill Tran | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 18 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-05-58 | 09/05/2025 | 09/12/2025 | Verification | Asphalt Binder | View |
| 2025-08-14-113 | 08/14/2025 | 08/14/2025 | Quality Assurance | Aggregate | View |
| 2025-09-05-51 | 09/05/2025 | 09/12/2025 | Verification | Aggregate | View |
| 2025-09-05-46 | 09/05/2025 | 09/12/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-07-08-64 | 07/08/2025 | 07/08/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-04-02-63 | 04/02/2025 | 04/03/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-03-28-32 | 03/28/2025 | 03/28/2025 | Quality Assurance | Aggregate | View |
| 2025-03-28-31 | 03/28/2025 | 03/28/2025 | Quality Assurance | Aggregate | View |
| 2025-03-28-30 | 03/28/2025 | 03/28/2025 | Quality Assurance | Aggregate | View |
| 2025-03-28-28 | 03/28/2025 | 04/03/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
