Project Details
This page displays current information for project DEA: 043W5604.
Project Information
| Project Identifiers | Project ID: 995174 DEA: 043W5604 EFIS: 0421000388 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-12,80,680-Var |
| Award Date | 09/03/2024 |
| Closeout Date | Not set |
| Work Description | POLYESTER CONCRETE OVERLAY. |
| Location Description | SOLANO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 11/16/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| justen.tatum@dot.ca.gov | Justen Tatum | Resident Engineer | Caltrans RE DB |
| kambiz.kouchesfahani@dot.ca.gov | Kambiz Kouchesfahani | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 43 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-04-110 | 08/04/2025 | 09/11/2025 | Production Start-Up | Reclaimed Asphalt Pavement | View |
| 2025-08-04-109 | 08/04/2025 | 09/11/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-04-108 | 08/04/2025 | 09/11/2025 | Production Start-Up | Aggregate | View |
| 2025-08-04-107 | 08/04/2025 | 08/06/2025 | Quality Assurance | Aggregate | View |
| 2025-08-06-92 | 08/06/2025 | 08/11/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-04-106 | 08/04/2025 | 08/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-05-100 | 08/05/2025 | 08/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-01-83 | 07/01/2025 | 07/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-07-81 | 07/07/2025 | 07/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-08-80 | 07/08/2025 | 07/09/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
