Project Details
This page displays current information for project DEA: 081P6804.
Project Information
| Project Identifiers | Project ID: 995145 DEA: 081P6804 EFIS: 0824000077 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-62-3.34/6.5 |
| Award Date | 08/28/2023 |
| Closeout Date | 11/20/2025 |
| Work Description | Remove Debris, Restore Undermined Roadway, Repair Damaged Bridge Piers) |
| Location Description | 3B08-Riv,SBd-62-R3.34/R6.5, 0.0/R2.64 4BOn HWY 62 in Riv & SBd Counties in Morongo Valley Fr 3.2 Mi W/o Indian Canyon Dr to 0.5 Mi W/o Big Morongo Canyon Rd 5B |
| QA Service Level | 1 (Verified on 09/11/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| francisco.montellano@dot.ca.gov | Francisco Montellano | Resident Engineer | Caltrans RE DB |
| shukri.abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-17-125 | 09/17/2024 | 09/18/2024 | Quality Control | Concrete | View |
| 2024-09-17-124 | 09/17/2024 | 09/18/2024 | Quality Control | Concrete | View |
| 2024-10-08-101 | 10/08/2024 | 10/08/2024 | Quality Control | Aggregate | View |
| 2024-09-12-81 | 09/12/2024 | 09/13/2024 | Quality Control | Concrete | View |
| 2024-09-09-100 | 09/09/2024 | 09/10/2024 | Quality Control | Concrete | View |
| 2024-09-03-67 | 09/03/2024 | 09/04/2024 | Quality Control | Concrete | View |
| 2024-09-04-109 | 09/04/2024 | 09/05/2024 | Quality Control | Concrete | View |
| 2024-08-28-107 | 08/28/2024 | 08/29/2024 | Quality Control | Concrete | View |
| 2024-08-23-87 | 08/23/2024 | 08/24/2024 | Quality Control | Concrete | View |
| 2024-09-12-56 | 09/12/2024 | 09/12/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
