Project Details
This page displays current information for project DEA: 07346204.
Project Information
| Project Identifiers | Project ID: 995129 DEA: 07346204 EFIS: 0718000072 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VEN-2,23,101-Var |
| Award Date | 04/10/2024 |
| Closeout Date | Not set |
| Work Description | UPGRADE AND INSTALL NEW TRANSPORTATION MANAGEMENT SYSTEM ELEMENTS. |
| Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 11/08/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joseph.s.tehrani@dot.ca.gov | JOSEPH SOLAIMAN TEHRANI | Resident Engineer | Caltrans RE DB |
| azizollah.maghsoudloo@bureauveritas.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-26-20 | 11/26/2025 | 11/26/2025 | Quality Assurance | Soil | View |
| 2025-10-17-30 | 10/17/2025 | 10/20/2025 | Acceptance | Concrete | View |
| 2025-06-23-66 | 06/23/2025 | 06/24/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-10-114 | 06/10/2025 | 06/12/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-10-113 | 06/10/2025 | 06/12/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-09-112 | 06/09/2025 | 06/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-22-9 | 07/22/2025 | 07/22/2025 | Acceptance | Soil | View |
| 2025-07-07-10 | 07/07/2025 | 07/07/2025 | Acceptance | Soil | View |
| 2025-07-02-13 | 07/02/2025 | 07/02/2025 | Acceptance | Soil | View |
| 2025-07-02-12 | 07/02/2025 | 07/02/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
