Project Details
This page displays current information for project DEA: 11430394.
Project Information
| Project Identifiers | Project ID: 995067 DEA: 11430394 EFIS: 1118000115 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-23.9/25.1 |
| Award Date | 11/03/2023 |
| Closeout Date | Not set |
| Work Description | WIDEN FREEWAY, STRUCTURES, CONSTRUCT SIGNS, LANDSCAPE AND ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF ROUTE 805/52 SEPARATION TO 0.3 MILE SOUTH OF NOBEL DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 12/19/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Tyler.Jones@dot.ca.gov | Tyler Jones | Resident Engineer | Caltrans RE DB |
| carlos.guzman@dot.ca.gov | Carlos Guzman | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 58 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-19-61 | 05/19/2025 | 05/20/2025 | Quality Control | Aggregate | View |
| 2025-05-19-60 | 05/19/2025 | 05/20/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-18-5 | 05/18/2025 | 05/19/2025 | Quality Control | Aggregate | View |
| 2025-05-18-4 | 05/18/2025 | 05/19/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-14-45 | 05/14/2025 | 05/19/2025 | Quality Control | Aggregate | View |
| 2025-05-14-35 | 05/14/2025 | 05/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-13-60 | 05/13/2025 | 05/16/2025 | Quality Control | Aggregate | View |
| 2025-05-13-59 | 05/13/2025 | 05/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-05-12-40 | 05/12/2025 | 05/16/2025 | Quality Control | Aggregate | View |
| 2025-05-12-39 | 05/12/2025 | 05/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
