Project Details
This page displays current information for project DEA: 061A1204.
Project Information
| Project Identifiers | Project ID: 994999 DEA: 061A1204 EFIS: 0621000176 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-5,41,180-Var |
| Award Date | 04/19/2023 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cary.cruz@dot.ca.gov | Cary Cruz | Resident Engineer | Caltrans RE DB |
| Jason.frank@nv5.com | Jason Frank | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-10-29 | 08/10/2023 | 08/10/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-07-27-54 | 07/27/2023 | 07/28/2023 | Quality Control | Polyester | View |
| 2023-07-22-6 | 07/22/2023 | 07/22/2023 | Department Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
