Project Details
This page displays current information for project DEA: 073255U4.
Project Information
| Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
| Award Date | 04/12/2023 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| steven.taing@dot.ca.gov | Steven Taing | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 110 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-04-27 | 12/04/2025 | 12/04/2025 | Quality Assurance | Soil | View |
| 2025-12-04-26 | 12/04/2025 | 12/04/2025 | Quality Assurance | Soil | View |
| 2025-12-04-25 | 12/04/2025 | 12/04/2025 | Quality Assurance | Soil | View |
| 2025-12-04-24 | 12/04/2025 | 12/04/2025 | Quality Assurance | Soil | View |
| 2025-07-29-119 | 07/29/2025 | 08/01/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-30-71 | 06/30/2025 | 07/15/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-10-125 | 07/10/2025 | 07/14/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-08-94 | 07/08/2025 | 07/14/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-16-57 | 09/16/2025 | 09/13/2025 | Acceptance | Concrete | View |
| 2025-08-23-7 | 08/23/2025 | 08/23/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-80-2025-66 | Submittal Completeness in Review | Ray Alcantara | RMA Group - Rancho Cucamonga | 10/07/2025 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
