Project Details
This page displays current information for project DEA: 010F9704.
Project Information
| Project Identifiers | Project ID: 994928 DEA: 010F9704 EFIS: 0116000111 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-162-29.18/30.27 |
| Award Date | 04/19/2023 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Roozbeh.Hadipour@dot.ca.gov | Roozbeh Hadipour | Resident Engineer | Caltrans RE DB |
| mostafa.bayoumi@dot.ca.gov | Mostafa Bayoumi | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-03-37 | 10/03/2025 | 10/31/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-07-28-8 | 07/28/2025 | Verification | SMTL TM5 - Headed Bars | View | |
| 2025-07-28-7 | 07/28/2025 | 07/30/2025 | Verification | SMTL TM5 - Headed Bars | View |
| 2025-07-28-6 | 07/28/2025 | 07/30/2025 | Verification | SMTL TM5 - Headed Bars | View |
| 2025-07-22-3 | 07/22/2025 | 07/22/2025 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2025-07-22-2 | 07/22/2025 | 07/22/2025 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods