Project Details
This page displays current information for project DEA: 120T1204.
Project Information
| Project Identifiers | Project ID: 994907 DEA: 120T1204 EFIS: 1222000004 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA,-57-12.3 |
| Award Date | 08/05/2023 |
| Closeout Date | 09/20/2024 |
| Work Description | DECK SPALL REPAIR AND POLYESTER CONCRETE OVERLAY. |
| Location Description | ORANGE COUNTY IN ANAHEIM AT STADIUM OVERHEAD |
| QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| karim.ahmed@dot.ca.gov | Karim Ahmed | Resident Engineer | Caltrans RE DB |
| karim.ahmed@dot.ca.gov | Karim Ahmed | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-03-26-50 | 03/26/2024 | 03/27/2024 | Quality Control | Polyester | View |
| 2024-03-13-34 | 03/13/2024 | 03/14/2024 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
