Project Details
This page displays current information for project DEA: 112T3434.
Project Information
| Project Identifiers | Project ID: 994901 DEA: 112T3434 EFIS: 1120000081 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-5.1/8.3 |
| Award Date | 01/29/2024 |
| Closeout Date | Not set |
| Work Description | SOUNDWALLS, WIDEN FREEWAY, STRUCTURES, LANDSCAPE AND ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM PALOMAR STREET OVERCROSSING TO 0.5 MILE NORTH OF BONITA ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 03/21/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Tan.Cao@dot.ca.gov | Tan Cao | Resident Engineer | Caltrans RE DB |
| daniela.lopez@dot.ca.gov | Daniela Lopez | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 408 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-15-22 | 07/15/2026 | 07/15/2026 | Quality Control | Concrete | View |
| 2026-07-09-11 | 07/09/2026 | 07/09/2026 | Quality Control | Concrete | View |
| 2026-06-04-153 | 06/04/2026 | 06/05/2026 | Quality Control | Concrete | View |
| 2026-05-21-82 | 05/21/2026 | 05/22/2026 | Quality Control | Concrete | View |
| 2026-05-21-81 | 05/21/2026 | 05/22/2026 | Quality Control | Concrete | View |
| 2026-07-07-1 | 07/07/2026 | 07/07/2026 | Quality Control | Concrete | View |
| 2026-07-06-1 | 07/06/2026 | 07/06/2026 | Quality Assurance | Soil | View |
| 2026-06-10-86 | 06/10/2026 | 06/11/2026 | Production Start-Up | Aggregate | View |
| 2026-06-10-85 | 06/10/2026 | 06/11/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-07-02-4 | 07/02/2026 | 07/02/2026 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
