Project Details
This page displays current information for project DEA: 010H6104.
Project Information
Project Identifiers | Project ID: 994857 DEA: 010H6104 EFIS: 0117000241 |
---|---|
DIST-CO-RTE-PM | 01-HUM-36-13.5/R36.1 |
Award Date | 10/31/2023 |
Closeout Date | Not set |
Work Description | COLD PLANE AND OVERLAY HMA, & REPLACE GUARDRAILS. |
Location Description | HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEK BRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER |
QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joaquin.s.rodriguez@dot.ca.gov | Joaquin Rodriquez | Resident Engineer | Caltrans RE DB |
Ryan.Duran@dot.ca.gov | Ryan Duran | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-05-29-14 | 05/29/2024 | 05/30/2024 | Acceptance | Asphalt Binder | View |
2024-05-29-34 | 05/29/2024 | 05/30/2024 | Acceptance | Asphalt Rubber Binder | View |
2024-04-12-35 | 04/12/2024 | 04/16/2024 | Department Acceptance | Asphalt Binder | View |
2024-04-09-39 | 04/09/2024 | 04/09/2024 | Verification | Asphalt Binder | View |
2024-04-09-51 | 04/09/2024 | 04/09/2024 | Quality Assurance | Asphalt Rubber Binder | View |
2024-04-08-29 | 04/08/2024 | 04/10/2024 | Quality Assurance | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods