Project Details
This page displays current information for project DEA: 010H6104.
Project Information
| Project Identifiers | Project ID: 994857 DEA: 010H6104 EFIS: 0117000241 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-13.5/R36.1 |
| Award Date | 10/31/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AND OVERLAY HMA, & REPLACE GUARDRAILS. |
| Location Description | HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEK BRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER |
| QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joaquin.s.rodriguez@dot.ca.gov | Joaquin Rodriquez | Resident Engineer | Caltrans RE DB |
| shantanu.nalawade@dot.ca.gov | Shantanu Nalawade | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 59 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-07-30 | 08/07/2025 | 08/12/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-07-25-45 | 07/25/2025 | 08/04/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-07-16-66 | 07/16/2025 | 07/24/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-06-13-11 | 06/13/2025 | 06/13/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-04-22-98 | 04/22/2025 | 05/19/2025 | Production Start-Up | Asphalt Rubber Binder | View |
| 2025-04-14-5 | 04/14/2025 | 04/14/2025 | Quality Assurance | Roadway/Bridge Surface | View |
| 2025-03-25-27 | 03/25/2025 | 03/28/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-03-25-26 | 03/25/2025 | 03/28/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-02-27-8 | 02/27/2025 | 02/28/2025 | Acceptance | Concrete | View |
| 2024-12-20-15 | 12/20/2024 | 12/25/2024 | Quality Assurance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
