Project Details
This page displays current information for project DEA: 032J9104.
Project Information
| Project Identifiers | Project ID: 994835 DEA: 032J9104 EFIS: 0322000136 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-80-25.5/27.3 |
| Award Date | 04/12/2024 |
| Closeout Date | 06/02/2025 |
| Work Description | POLYESTER CONC, REPLACE JOINT SEAL (ASPHALT RUBBER), CONCRETE BARRIER. |
| Location Description | NEVADA COUNTY NEAR FLORISTON FROM 1.9 MILES EAST OF HINTON ROAD TO TRUCKEE RIVER BRIDGE |
| QA Service Level | 1 (Verified on 05/22/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Reza.Salehi@dot.ca.gov | Reza Salehi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-05-64 | 08/05/2024 | 08/06/2024 | Quality Control | Polyester | View |
| 2024-06-12-85 | 06/12/2024 | 06/13/2024 | Quality Control | Polyester | View |
| 2024-06-10-69 | 06/10/2024 | 06/11/2024 | Quality Control | Polyester | View |
| 2024-06-07-30 | 06/07/2024 | 06/10/2024 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
