Project Details
This page displays current information for project DEA: 060V1104.
Project Information
Project Identifiers | Project ID: 994820 DEA: 060V1104 EFIS: 0616000208 |
---|---|
DIST-CO-RTE-PM | 06-FRE,KIN-5,41,198-Var |
Award Date | 08/31/2023 |
Closeout Date | Not set |
Work Description | STRATFORD KINGS RIVER BRIDGE REPLACEMENT. |
Location Description | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 09/20/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
martin.j.garcia@dot.ca.gov | Martin Garcia | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 133 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-12-38 | 06/12/2024 | 06/13/2024 | Acceptance | Aggregate | View |
2024-05-02-4 | 05/02/2024 | 05/02/2024 | Quality Assurance | Aggregate | View |
2024-05-02-16 | 05/02/2024 | 05/03/2024 | Quality Assurance | Concrete | View |
2024-04-22-1 | 04/22/2024 | 04/19/2024 | Quality Assurance | Concrete | View |
2024-04-19-21 | 04/19/2024 | 04/19/2024 | Department Acceptance | Aggregate | View |
2024-04-12-27 | 04/12/2024 | 04/12/2024 | Quality Control | Concrete | View |
2024-04-12-32 | 04/12/2024 | 04/11/2024 | Quality Assurance | Concrete | View |
2024-04-10-50 | 04/10/2024 | 04/10/2024 | Quality Control | Concrete | View |
2024-04-09-23 | 04/09/2024 | 04/10/2024 | Quality Assurance | Concrete | View |
2024-04-09-61 | 04/09/2024 | 04/11/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-1 of 1 result.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | Con-Fab California Corporation - Lathrop (Danny Cabias) | 100,089 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods