This page displays current information for project DEA: 010E11U4.
Project Information
| Project Identifiers | Project ID: 994816 DEA: 010E11U4 EFIS: 0123000069 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-1-31.1/31.6 |
| Award Date | 11/15/2023 |
| Closeout Date | Not set |
| Work Description | STRUCTURAL CONC BRIDGE, TEMP BRIDGE AND BAR REINFORCING STEEL. |
| Location Description | MENDOCINO COUNTY NEAR ELK FROM 0.2 MILE SOUTH OF ELK CREEK BRIDGE TO 0.2 MILE NORTH OF ELK CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/22/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Mojtaba.Mosallai@dot.ca.gov | Mojtaba Mosallai | Resident Engineer | Caltrans RE DB |
| mostafa.bayoumi@dot.ca.gov | Mostafa Bayoumi | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-23-6 | 09/23/2025 | 09/29/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-07-14-2 | 07/14/2025 | 07/16/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2024-10-09-2 | 10/09/2024 | 10/14/2024 | Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-14 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-13 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-12 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-11 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-10 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-08-21-9 | 08/21/2024 | 08/26/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-07-09-14 | 07/09/2024 | 07/15/2024 | Verification | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||