Project Details
This page displays current information for project DEA: 07390204.
Project Information
| Project Identifiers | Project ID: 994675 DEA: 07390204 EFIS: 0722000334 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-47-0.4 / 2.1 |
| Award Date | 01/24/2025 |
| Closeout Date | Not set |
| Work Description | Bridge deck replacement with lightweight precast deck panels ultra high performance concrete. Also includes: replacement of seismic sensors, upgrades to median barrier, railings, fences and guard rails. New finger joints. |
| Location Description | RTE 47 between Terminal Island and San Pedro PM 0.4/2.1 |
| QA Service Level | 1 (Verified on 08/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| samuel.gallardo@dot.ca.gov | Sam Gallardo | Resident Engineer | Caltrans RE DB |
| sami.deeb@dot.ca.gov | Sami Deeb | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 122 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-14-20 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-19 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-18 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-17 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-13-13 | 07/13/2026 | Quality Control | Precast Concrete | View | |
| 2026-07-10-7 | 07/10/2026 | Quality Control | Precast Concrete | View | |
| 2026-07-07-55 | 07/07/2026 | 07/09/2026 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
| 2026-07-08-1 | 07/08/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2026-07-07-27 | 07/07/2026 | 07/14/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-07-07-26 | 07/07/2026 | 07/14/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
