Project Details

This page displays current information for project DEA: 07390204.

Project Information

Project IdentifiersProject ID: 994675
DEA: 07390204
EFIS: 0722000334
DIST-CO-RTE-PM07-LA-47-0.4 / 2.1
Award Date01/24/2025
Closeout DateNot set
Work DescriptionBridge deck replacement with lightweight precast deck panels ultra high performance concrete. Also includes: replacement of seismic sensors, upgrades to median barrier, railings, fences and guard rails. New finger joints.
Location DescriptionRTE 47 between Terminal Island and San Pedro PM 0.4/2.1
QA Service Level1 (Verified on 08/07/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
samuel.gallardo@dot.ca.govSam GallardoResident EngineerCaltrans RE DB
sami.deeb@dot.ca.govSami DeebStructural RepresentativeCaltrans SR DB
james.devey@dot.ca.govJames DeveyMETS REPCaltrans METS REP DB
nader.gobran@dot.ca.govNader GobranDistrict Materials Engineer - DesignCaltrans District Materials Engineer
huey-min.tzou@dot.ca.govHuey-Min TzouDistrict Materials Engineer - Field TestsCaltrans District Materials Engineer
victor.zengler@dot.ca.govVictor ZenglerDistrict Materials Engineer - Plant Services QC/QACaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 1-10 of 269 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-10-29-1310/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-1210/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-710/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-610/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-410/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-310/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-29-210/29/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-10-20-5510/20/202608/31/2026Quality ControlConcreteView
2026-10-21-1210/21/202608/31/2026Quality ControlConcreteView
2026-10-22-210/22/202608/31/2026Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
073902042026-07-20-1907/20/2026View
073902042026-07-13-1307/13/2026View
073902042026-07-10-707/10/2026View
073902042026-07-10-707/10/2026View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods