Project Details
This page displays current information for project DEA: 09382104.
Project Information
| Project Identifiers | Project ID: 994657 DEA: 09382104 EFIS: 0919000035 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-168-17.5/17.8 |
| Award Date | 01/25/2024 |
| Closeout Date | 08/29/2024 |
| Work Description | PLACE HMA AND CONSTRUCT CONCRETE CURB RAMPS AND SIDEWALK. |
| Location Description | INYO COUNTY IN AND NEAR BISHOP FROM 0.1 MILE WEST OF PIONEER LANE TO SUNLAND DRIVE |
| QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| adam.zumstein@dot.ca.gov | Adam Zumstein | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-11-19 | 07/11/2024 | 07/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-11-18 | 07/11/2024 | 07/11/2024 | Quality Assurance | Aggregate | View |
| 2024-07-11-15 | 07/11/2024 | 07/12/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-06-25-2 | 06/25/2024 | 06/25/2024 | Acceptance | Aggregate | View |
| 2024-06-24-2 | 06/24/2024 | 06/24/2024 | Acceptance | Aggregate | View |
| 2024-06-17-15 | 06/17/2024 | 06/18/2024 | Acceptance | Aggregate | View |
| 2024-06-17-5 | 06/17/2024 | 06/17/2024 | Acceptance | Aggregate | View |
| 2024-06-14-6 | 06/14/2024 | 06/14/2024 | Acceptance | Aggregate | View |
| 2024-06-13-6 | 06/13/2024 | 06/13/2024 | Acceptance | Aggregate | View |
| 2024-06-13-5 | 06/13/2024 | 06/13/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
