Project Details
This page displays current information for project DEA: 07313504.
Project Information
| Project Identifiers | Project ID: 994654 DEA: 07313504 EFIS: 0715000090 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VEN-1-37.7/62.9,0.0/0.9 |
| Award Date | 07/20/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE AND CONSTRUCT BRIDGE AND CULVERTS. |
| Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
| aziz.maghsoudloo@bureauveritas.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 147 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-17-103 | 04/17/2025 | 04/18/2025 | Quality Control | Concrete | View |
| 2025-04-07-117 | 04/07/2025 | 04/08/2025 | Quality Control | Concrete | View |
| 2025-04-07-116 | 04/07/2025 | 04/08/2025 | Quality Control | Aggregate | View |
| 2025-04-07-115 | 04/07/2025 | 04/08/2025 | Quality Control | Concrete | View |
| 2025-04-07-114 | 04/07/2025 | 04/08/2025 | Quality Control | Aggregate | View |
| 2024-11-12-62 | 11/12/2024 | 11/13/2024 | Quality Control | Concrete | View |
| 2024-11-12-61 | 11/12/2024 | 11/13/2024 | Quality Control | Concrete | View |
| 2024-11-12-60 | 11/12/2024 | 11/13/2024 | Quality Control | Aggregate | View |
| 2024-12-05-94 | 12/05/2024 | 12/06/2024 | Quality Control | Concrete | View |
| 2024-12-05-93 | 12/05/2024 | 12/06/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
