Project Details
This page displays current information for project DEA: 120T6404.
Project Information
| Project Identifiers | Project ID: 994621 DEA: 120T6404 EFIS: 1222000074 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-72-11.4/12.0 |
| Award Date | 04/13/2023 |
| Closeout Date | Not set |
| Work Description | PLACE RHMA-G AND MODIFY SIGNAL AND LIGHTING SYSTEM. |
| Location Description | ORANGE COUNTY IN LA HABRA FROM JUNCTION 39 AT WHITTIER-BEACH TO VALLEY HOME AVENUE |
| QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.ezzedine@dot.ca.gov | Mike Ezzedine | Resident Engineer | Caltrans RE DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-11-96 | 09/11/2023 | 09/11/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-13-75 | 09/13/2023 | 09/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-11-63 | 09/11/2023 | 09/14/2023 | Production Start-Up | Asphalt Binder | View |
| 2023-09-11-46 | 09/11/2023 | 09/14/2023 | Production Start-Up | Asphalt Rubber Binder | View |
| 2023-09-13-25 | 09/13/2023 | 09/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-11-35 | 09/11/2023 | 09/14/2023 | Production Start-Up | Hot Mix Asphalt | View |
| 2023-09-11-33 | 09/11/2023 | 09/14/2023 | Verification | Crumb Rubber Modifier | View |
| 2023-09-11-32 | 09/11/2023 | 09/14/2023 | Verification | Crumb Rubber Modifier | View |
| 2023-09-11-31 | 09/11/2023 | 09/14/2023 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
