Project Details
This page displays current information for project DEA: 081M1804.
Project Information
Project Identifiers | Project ID: 994593 DEA: 081M1804 EFIS: 0821000087 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10,74,79,86,111,243-Var |
Award Date | 05/09/2023 |
Closeout Date | 08/30/2024 |
Work Description | POLYESTER CONCRETE AND HOT MIX ASPHALT OVERLAY. |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 07/14/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
md.rahman@dot.ca.gov | Md Rahman | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-22-125 | 04/22/2024 | 04/23/2024 | Production Start-Up | Hot Mix Asphalt | View |
2024-04-23-77 | 04/23/2024 | 05/01/2024 | Verification | Asphalt Binder | View |
2024-04-22-64 | 04/22/2024 | 04/24/2024 | Verification | Asphalt Binder | View |
2024-04-23-57 | 04/23/2024 | 04/30/2024 | Department Acceptance | Hot Mix Asphalt | View |
2024-04-22-52 | 04/22/2024 | 04/23/2024 | Verification | Aggregate | View |
2024-03-23-1 | 03/23/2024 | 03/23/2024 | Department Acceptance | Roadway/Bridge Surface | View |
2023-10-16-25 | 10/16/2023 | 10/19/2023 | Verification | Asphalt Binder | View |
2023-10-16-24 | 10/16/2023 | 10/19/2023 | Verification | Aggregate | View |
2023-09-26-32 | 09/26/2023 | 09/28/2023 | Verification | Asphalt Binder | View |
2023-09-26-28 | 09/26/2023 | 09/28/2023 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods