Project Details
This page displays current information for project DEA: 081C08U4.
Project Information
| Project Identifiers | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R134.0/R156.5 |
| Award Date | 06/22/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB |
| Location Description | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 08/02/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Ryan.Luis.Espoy@dot.ca.gov | Ryan Espoy (cc on Reports) | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 439 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-14-26 | 11/14/2025 | 11/17/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-09-04-114 | 09/04/2025 | 09/16/2025 | Verification | Asphalt Binder | View |
| 2026-01-30-27 | 01/30/2026 | 01/30/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-01-29-34 | 01/29/2026 | 02/02/2026 | Acceptance | Hot Mix Asphalt | View |
| 2025-11-14-25 | 11/14/2025 | 11/17/2025 | Verification | Asphalt Binder | View |
| 2026-02-20-12 | 02/20/2026 | 02/23/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-02-19-10 | 02/19/2026 | 02/23/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-02-11-18 | 02/11/2026 | 02/18/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-02-12-29 | 02/12/2026 | 02/18/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-02-13-42 | 02/13/2026 | 02/18/2026 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
