Project Details
This page displays current information for project DEA: 032G5204.
Project Information
| Project Identifiers | Project ID: 994549 DEA: 032G5204 EFIS: 0321000235 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV,PLA,SIE-20,49,80-VAR |
| Award Date | 05/22/2023 |
| Closeout Date | 05/03/2024 |
| Work Description | PLACE POLYESTER CONCRETE OVERLAY AND REPLACE JOINT SEALS. |
| Location Description | NEVADA, PLACER AND SIERRA COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 05/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tad.sampson@dot.ca.gov | Tad Sampson | Resident Engineer | Caltrans RE DB |
| jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-18-57 | 09/18/2023 | 09/19/2023 | Quality Control | Polyester | View |
| 2023-09-19-26 | 09/19/2023 | 09/20/2023 | Quality Control | Polyester | View |
| 2023-08-30-66 | 08/30/2023 | 08/31/2023 | Quality Control | Polyester | View |
| 2023-09-01-37 | 09/01/2023 | 09/05/2023 | Quality Control | Polyester | View |
| 2023-09-05-5 | 09/05/2023 | 09/05/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-08-24-45 | 08/24/2023 | 08/25/2023 | Quality Control | Polyester | View |
| 2023-08-25-42 | 08/25/2023 | 08/28/2023 | Quality Control | Polyester | View |
| 2023-08-18-61 | 08/18/2023 | 08/18/2023 | Quality Control | Polyester | View |
| 2023-07-20-29 | 07/20/2023 | 07/21/2023 | Quality Control | Polyester | View |
| 2023-07-13-35 | 07/13/2023 | 07/14/2023 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
