Project Details
This page displays current information for project DEA: 044J89U4.
Project Information
| Project Identifiers | Project ID: 994469 DEA: 044J89U4 EFIS: 0419000140 COOP: 042806 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-82-18.2/26.4 |
| Award Date | 08/17/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC, RHMA, SLAB REPL, CURB RAMPS, AND MOD ELECT SYSTEMS. |
| Location Description | SANTA CLARA COUNTY AT VARIOUS LOCATIONS FROM KNICKERBOCKER DRIVE IN SUNNYVALE TO SAN MATEO COUNTY LINE IN PALO ALTO |
| QA Service Level | 1 (Verified on 05/09/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arif.khan@dot.ca.gov | Arif Khan | Resident Engineer | Caltrans RE DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 71 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-29-126 | 05/29/2025 | 05/29/2025 | Quality Assurance | Soil | View |
| 2025-01-16-67 | 01/16/2025 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2025-01-16-66 | 01/16/2025 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2025-01-16-65 | 01/16/2025 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2025-01-15-73 | 01/15/2025 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2025-01-15-72 | 01/15/2025 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2024-12-12-47 | 12/12/2024 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2024-12-12-46 | 12/12/2024 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2024-12-12-45 | 12/12/2024 | 02/04/2025 | Annual Source Testing | Aggregate | View |
| 2024-12-09-70 | 12/09/2024 | 02/04/2025 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
