Project Details
This page displays current information for project DEA: 120N72A4.
Project Information
| Project Identifiers | Project ID: 994456 DEA: 120N72A4 |
|---|---|
| DIST-CO-RTE-PM | 12--- |
| Award Date | 11/22/2022 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| christopher.blanco@dot.ca.gov | Christopher Blanco | Resident Engineer | Caltrans RE DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-03-08-35 | 03/08/2024 | 03/08/2024 | Quality Assurance | Concrete | View |
| 2024-01-31-24 | 01/31/2024 | 01/31/2024 | Quality Assurance | Concrete | View |
| 2023-12-29-9 | 12/29/2023 | 12/29/2023 | Quality Assurance | Concrete | View |
| 2023-10-20-18 | 10/20/2023 | 10/20/2023 | Quality Assurance | Concrete | View |
| 2023-08-31-13 | 08/31/2023 | 09/01/2023 | Quality Assurance | Concrete | View |
| 2023-06-15-56 | 06/15/2023 | 06/15/2023 | Quality Assurance | Concrete | View |
| 2023-06-30-17 | 06/30/2023 | 06/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-05-23-11 | 05/23/2023 | 05/23/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods