Project Details
This page displays current information for project DEA: 081J9904.
Project Information
| Project Identifiers | Project ID: 994452 DEA: 081J9904 EFIS: 0818000153 Permit Numbers: 0822ADP0470 0822AOP0255 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-91-9.2 |
| Award Date | 11/17/2021 |
| Closeout Date | Not set |
| Work Description | Reconstruct and realign SR-91/McKinley interchange consisting of retaining walls, drainage facilities, new overhead signs, signal replacement, ramp metering, interconnect, street lighting, signing/striping |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 12/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kelsie.cranford@dot.ca.gov | Kelsie Cranford | Resident Engineer | Caltrans RE DB |
| scott@dankencm.com | Scott Walker | Oversight Resident Engineer | Caltrans REO DB |
| scott@dankencm.com | Scott Walker | Oversight Structural Representative | Caltrans SRO DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
