Project Details
This page displays current information for project DEA: 053307C4.
Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| brian.harrington@dot.ca.gov | Brian Harrington | Resident Engineer | Caltrans RE DB |
| david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 1017 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-16-62 | 12/16/2025 | 12/16/2025 | Acceptance | Concrete | View |
| 2026-01-08-15 | 01/08/2026 | 01/08/2026 | Quality Assurance | Aggregate | View |
| 2025-12-15-38 | 12/15/2025 | 12/15/2025 | Acceptance | Concrete | View |
| 2025-12-09-56 | 12/09/2025 | 01/09/2026 | Dispute Resolution | Aggregate | View |
| 2025-12-09-55 | 12/09/2025 | 01/09/2026 | Dispute Resolution | Hot Mix Asphalt | View |
| 2025-01-24-67 | 01/24/2025 | 01/06/2026 | Dispute Resolution | Hot Mix Asphalt | View |
| 2025-03-26-100 | 03/26/2025 | 01/06/2026 | Dispute Resolution | Hot Mix Asphalt | View |
| 2025-12-30-8 | 12/30/2025 | 12/30/2025 | Acceptance | Concrete | View |
| 2026-01-06-2 | 01/06/2026 | 01/06/2026 | Acceptance | Roadway/Bridge Surface | View |
| 2026-01-06-1 | 01/06/2026 | 01/06/2026 | Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
