Project Details
This page displays current information for project DEA: 120U1604.
Project Information
| Project Identifiers | Project ID: 994438 DEA: 120U1604 EFIS: 1223000043 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-1-12.07 |
| Award Date | 10/03/2022 |
| Closeout Date | 07/28/2023 |
| Work Description | CONSTRUCT SOLDIER PILE WALL AND PRE-CAST CONCRETE LAGGING, CEMENT SLURRY BACKFILL |
| Location Description | Culvert Failure and Shoulder Lost on SR-1 (PCH) in City of Laguna Beach. |
| QA Service Level | 1 (Verified on 12/15/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kami.fallah@dot.ca.gov | Kami Fallah | Resident Engineer | Caltrans RE DB |
| chungkeun.lee@dot.ca.gov | Chungkeun Lee | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-02-10-61 | 02/10/2023 | 02/10/2023 | Quality Assurance | Concrete | View |
| 2023-01-12-54 | 01/12/2023 | 01/13/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
