This page displays current information for project DEA: 07330304.
Project Information
| Project Identifiers | Project ID: 994396 DEA: 07330304 EFIS: 0716000213 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-22.0/30.8 |
| Award Date | 10/09/2023 |
| Closeout Date | 09/25/2025 |
| Work Description | CONSTRUCT CONCRETE BARRIER AND STRUCTURAL CONCRETE BARRIER SLAB. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.6 MILE EAST OF ROUTE 710/10 SEPARATION TO 0.3 MILE WEST OF ROUTE 10/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| edgar.herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
| ryan.ramos@dot.ca.gov | Ryan Ramos | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 51 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-11-13 | 05/11/2025 | 05/11/2025 | Quality Control | Concrete | View |
| 2025-05-10-11 | 05/10/2025 | 05/10/2025 | Quality Control | Concrete | View |
| 2025-05-04-15 | 05/04/2025 | 05/04/2025 | Quality Control | Concrete | View |
| 2025-05-03-9 | 05/03/2025 | 05/03/2025 | Quality Control | Concrete | View |
| 2025-04-06-17 | 04/06/2025 | 04/06/2025 | Quality Control | Concrete | View |
| 2025-04-05-32 | 04/05/2025 | 04/05/2025 | Quality Control | Concrete | View |
| 2025-02-09-2 | 02/09/2025 | 02/09/2025 | Quality Control | Concrete | View |
| 2025-02-08-12 | 02/08/2025 | 02/08/2025 | Quality Control | Concrete | View |
| 2025-01-14-52 | 01/14/2025 | 01/14/2025 | Quality Control | Concrete | View |
| 2025-01-10-74 | 01/10/2025 | 01/10/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||