Project Details
This page displays current information for project DEA: 040K6304.
Project Information
| Project Identifiers | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29-16.4/19.0 |
| Award Date | 06/27/2023 |
| Closeout Date | Not set |
| Work Description | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. |
| Location Description | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG |
| QA Service Level | 1 (Verified on 10/27/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| danilo.patenia@dot.ca.gov | Danilo Patenia | Resident Engineer | Caltrans RE DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 37 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-05-132 | 09/05/2024 | 09/05/2024 | Quality Assurance | Aggregate | View |
| 2024-10-17-87 | 10/17/2024 | 10/17/2024 | Quality Control | Concrete | View |
| 2024-10-18-57 | 10/18/2024 | 11/13/2024 | Quality Assurance | Concrete | View |
| 2024-10-17-71 | 10/17/2024 | 11/13/2024 | Quality Assurance | Concrete | View |
| 2024-10-31-27 | 10/31/2024 | 11/01/2024 | Production Start-Up | Aggregate | View |
| 2024-10-31-26 | 10/31/2024 | 11/01/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-10-31-25 | 10/31/2024 | 11/01/2024 | Production Start-Up | Reclaimed Asphalt Pavement | View |
| 2024-09-27-75 | 09/27/2024 | 09/27/2024 | Quality Control | Concrete | View |
| 2024-09-19-93 | 09/19/2024 | 09/19/2024 | Quality Control | Concrete | View |
| 2024-09-12-82 | 09/12/2024 | 09/12/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
