Project Details

This page displays current information for project DEA: 040K6304.

Project Information

Project IdentifiersProject ID: 994378
DEA: 040K6304
EFIS: 0416000111
DIST-CO-RTE-PM04-NAP-29-16.4/19.0
Award Date06/27/2023
Closeout DateNot set
Work DescriptionBRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING.
Location DescriptionNAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG
QA Service Level1 (Verified on 10/27/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
danilo.patenia@dot.ca.govDanilo PateniaResident EngineerCaltrans RE DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 36 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-10-17-8710/17/202410/17/2024Quality ControlConcreteView
2024-10-18-5710/18/202411/13/2024Quality AssuranceConcreteView
2024-10-17-7110/17/202411/13/2024Quality AssuranceConcreteView
2024-10-31-2710/31/202411/01/2024Production Start-UpAggregateView
2024-10-31-2610/31/202411/01/2024Production Start-UpHot Mix AsphaltView
2024-10-31-2510/31/202411/01/2024Production Start-UpReclaimed Asphalt PavementView
2024-09-27-7509/27/202409/27/2024Quality ControlConcreteView
2024-09-19-9309/19/202409/19/2024Quality ControlConcreteView
2024-09-12-8209/12/202409/12/2024Quality ControlConcreteView
2024-09-27-7009/27/202410/16/2024Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

33.3%44.4%19.4%CT D04 - Concord Field Laboratory (33.3%)CT D04 - Fairfield Construction Field Office 59-545 (44.4%)CT HQ - Sacramento Structural Materials Testing Laboratory (2.8%)RMA Group - Rancho Cordova (19.4%)

Sample Types

8.3%72.2%19.4%Production Start-Up (8.3%)Quality Assurance (72.2%)Quality Control (19.4%)

Number of Tests

48.2%10.9%10%22.7%CT D04 - Concord Field Laboratory (48.2%)CT D04 - Fairfield Construction Field Office 59-545 (10.9%)CT HQ - Sacramento Chemistry Laboratory (0.9%)CT HQ - Sacramento Concrete Testing Laboratory (10%)CT HQ - Sacramento Structural Materials Testing Laboratory (2.7%)CT HQ - Vallejo Field Laboratory (4.5%)RMA Group - Rancho Cordova (22.7%)

Test Types

70%22.7%Production Start-Up (7.3%)Quality Assurance (70%)Quality Control (22.7%)

Material Types

27.8%63.9%Aggregate (27.8%)Concrete (63.9%)Hot Mix Asphalt (2.8%)Reclaimed Asphalt Pavement (2.8%)SMTL TM1 - Elastomeric Bearing Pad (2.8%)

Test Methods

17.3%8.2%9.1%ASTM C 143 (0.9%)CTM 202 (17.3%)CTM 217 (8.2%)AASHTO T 176 (0.9%)CTM 504 (1.8%)CTM 518 (1.8%)CTM 557 (0.9%)CTM 226 (6.4%)SMTL BILST (0.9%)CTM 227 (9.1%)