Project Details
This page displays current information for project DEA: 044J9104.
Project Information
| Project Identifiers | Project ID: 994366 DEA: 044J9104 EFIS: 0416000010 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-87-0.0/6.1 |
| Award Date | 04/19/2023 |
| Closeout Date | Not set |
| Work Description | Cold plane AC, paving with RHMA, upgrade median CB and curb ramp. |
| Location Description | CONSTRUCTION ON STATE HIGHWAY IN SANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 85/87 SEPARATION TO 0.1 MILE NORTH OF JULIAN STREET UNDERCROSSING. |
| QA Service Level | 1 (Verified on 04/05/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ali.nikzad@dot.ca.gov | Ali Nikzad | Resident Engineer | Caltrans RE DB |
| steve.gong@dot.ca.gov | STEVE GONG | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 65 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-14-47 | 08/14/2024 | 08/15/2024 | Quality Assurance | Aggregate | View |
| 2024-08-13-85 | 08/13/2024 | 08/14/2024 | Quality Assurance | Aggregate | View |
| 2024-08-13-81 | 08/13/2024 | 08/14/2024 | Quality Assurance | Aggregate | View |
| 2024-08-14-45 | 08/14/2024 | 08/15/2024 | Quality Assurance | Aggregate | View |
| 2024-08-12-19 | 08/12/2024 | 08/13/2024 | Quality Assurance | Aggregate | View |
| 2024-08-12-18 | 08/12/2024 | 08/13/2024 | Quality Assurance | Aggregate | View |
| 2024-08-08-49 | 08/08/2024 | 08/09/2024 | Quality Assurance | Aggregate | View |
| 2024-08-09-47 | 08/09/2024 | 08/12/2024 | Quality Assurance | Aggregate | View |
| 2024-08-09-46 | 08/09/2024 | 08/12/2024 | Quality Assurance | Aggregate | View |
| 2024-07-31-61 | 07/31/2024 | 08/01/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
