Project Details
This page displays current information for project DEA: 051C3604.
Project Information
| Project Identifiers | Project ID: 994326 DEA: 051C3604 EFIS: 0512000134 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-217-0.9/1.4 |
| Award Date | 01/31/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGE. |
| Location Description | SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE |
| QA Service Level | 1 (Verified on 10/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| manny.yogarajah@dot.ca.gov | Manny Yogarajah | Resident Engineer | Caltrans RE DB |
| jose.fabian.velasco.diaz@dot.ca.gov | Fabian Velasco | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 168 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-04-6 | 11/04/2025 | 11/13/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-06-03-19 | 06/03/2025 | 06/03/2025 | Quality Control | SMTL TM5 - Couplers | View |
| 2025-06-03-18 | 06/03/2025 | 06/09/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-05-14-2 | 05/14/2025 | 05/14/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-05-14-1 | 05/14/2025 | 05/19/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-04-21-2 | 04/21/2025 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2025-04-21-1 | 04/21/2025 | 04/28/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2025-04-11-2 | 04/11/2025 | 04/11/2025 | Quality Control | SMTL TM5 - Welded Hoops | View |
| 2025-04-11-1 | 04/11/2025 | 04/17/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2025-04-08-4 | 04/08/2025 | 04/08/2025 | Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
