Project Details
This page displays current information for project DEA: 044J4904.
Project Information
| Project Identifiers | Project ID: 994325 DEA: 044J4904 EFIS: 0415000356 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-13-6.7/7.2 |
| Award Date | 01/09/2023 |
| Closeout Date | 11/27/2024 |
| Work Description | CONSTRUCT CONCRETE BARRIERS AND BARRIER SLAB, COLD PLANE AND OVERLAY. |
| Location Description | ALAMEDA COUNTY IN OAKLAND FROM 0.2 MILE NORTH OF LINCOLN AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF PARK BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 10/14/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| pervez.randhawa@dot.ca.gov | Pervez Randhawa | Resident Engineer | Caltrans RE DB |
| lalit.mathur@dot.ca.gov | Lalit Mathur | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 35 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-04-15-85 | 04/15/2024 | 04/21/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-04-18-70 | 04/18/2024 | 05/02/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-02-21-28 | 02/21/2024 | 02/22/2024 | Quality Control | Aggregate | View |
| 2024-02-21-27 | 02/21/2024 | 02/22/2024 | Quality Control | Concrete | View |
| 2024-04-16-71 | 04/16/2024 | 04/20/2024 | Quality Assurance | Aggregate | View |
| 2024-04-15-76 | 04/15/2024 | 04/16/2024 | Quality Assurance | Aggregate | View |
| 2024-04-15-74 | 04/15/2024 | 04/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-04-15-73 | 04/15/2024 | 04/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-04-11-65 | 04/11/2024 | 04/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-04-11-64 | 04/11/2024 | 04/11/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods