Project Details
This page displays current information for project DEA: 034F6504.
Project Information
Project Identifiers | Project ID: 994310 DEA: 034F6504 EFIS: 0314000233 |
---|---|
DIST-CO-RTE-PM | 03-YOL-50,80-0.0/2.5,4.1/R11.4 |
Award Date | 04/07/2023 |
Closeout Date | Not set |
Work Description | CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIBER OPTIC CABLE SYSTEMS. |
Location Description | YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) AND ON ROUTE 50 FROM ROUTE 80 JUNCTION TO JEFFERSON BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/04/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
matt.solano@dot.ca.gov | Matt Solano | Resident Engineer | Caltrans RE DB |
brent.bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 195 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-31-68 | 10/31/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-05-45 | 11/05/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-06-50 | 11/06/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-10-7 | 11/10/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-07-47 | 11/07/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-12-32 | 11/12/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-13-58 | 11/13/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-11-14-41 | 11/14/2024 | 11/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-10-24-71 | 10/24/2024 | 10/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-10-14-81 | 10/14/2024 | 10/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 51-53 of 53 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 47580 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 47580 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Seguin | CMC Rebar (TAMMY ARAGON) | 21399 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods