Project Details
This page displays current information for project DEA: 051K1204.
Project Information
| Project Identifiers | Project ID: 994248 DEA: 051K1204 EFIS: 0518000125 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR-9-1.0,4.0 |
| Award Date | 12/07/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | CONSTRUCT SIDEHILL VIADUCTS. |
| Location Description | SANTA CRUZ COUNTY AT 0.5 MILE NORTH OF VERNON STREET AND AT 0.8 MILE SOUTH OF GLENGARRY ROAD |
| QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| farshad.keshavarzi@dot.ca.gov | Farshad Keshavarzi | Resident Engineer | Caltrans RE DB |
| jwilcenski@mnsengineers.com | James Wilcenski | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 125 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-01-110 | 11/01/2023 | 11/01/2023 | Quality Control | Concrete | View |
| 2023-10-30-93 | 10/30/2023 | 10/30/2023 | Quality Control | Concrete | View |
| 2023-10-10-111 | 10/10/2023 | 10/10/2023 | Quality Control | Concrete | View |
| 2023-09-08-69 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
| 2023-07-17-73 | 07/17/2023 | 07/17/2023 | Quality Control | Concrete | View |
| 2023-06-21-91 | 06/21/2023 | 06/21/2023 | Quality Control | Concrete | View |
| 2023-12-05-18 | 12/05/2023 | 12/05/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-05-06-19 | 05/06/2023 | 05/06/2023 | Quality Control | Concrete | View |
| 2023-09-08-61 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
| 2023-09-08-60 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
