Project Details
This page displays current information for project DEA: 010H0214.
Project Information
| Project Identifiers | Project ID: 994239 DEA: 010H0214 EFIS: 0118000107 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-169-19.0/33.0 |
| Award Date | 12/07/2022 |
| Closeout Date | 08/21/2025 |
| Work Description | Cappell Walls |
| Location Description | HUMBOLDT COUNTY NEAR PECWAN FROM 3.4 MILES WEST OF CAPPELL CREEK BRIDGE TO 0.4 MILE EAST OF WEITCHPEC SCHOOL ROAD (Description of Work: Construct Soldier Pile Wall, Install Drainage, Place HMA (Type A)) |
| QA Service Level | 1 (Verified on 09/22/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Efren.Banuelos@dot.ca.gov | Efren Banuelos | Resident Engineer | Caltrans RE DB |
| Dustin.Helliwell@dot.ca.gov | Dustin Helliwell | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 32 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-12-04-16 | 12/04/2024 | 10/23/2024 | Quality Assurance | Concrete | View |
| 2024-12-03-16 | 12/03/2024 | 10/23/2024 | Quality Assurance | Concrete | View |
| 2024-11-04-37 | 11/04/2024 | 11/04/2024 | Quality Assurance | Asphalt Binder | View |
| 2024-10-22-2 | 10/22/2024 | 10/23/2024 | Quality Assurance | Concrete | View |
| 2024-09-06-6 | 09/06/2024 | 09/06/2024 | Quality Assurance | Concrete | View |
| 2023-12-15-16 | 12/15/2023 | 12/15/2023 | Quality Control | Concrete | View |
| 2023-11-08-19 | 11/08/2023 | 11/08/2023 | Quality Control | Concrete | View |
| 2023-11-07-45 | 11/07/2023 | 11/07/2023 | Quality Control | Concrete | View |
| 2023-11-06-14 | 11/06/2023 | 11/06/2023 | Quality Control | Concrete | View |
| 2023-11-03-11 | 11/03/2023 | 11/03/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods