Project Details
This page displays current information for project DEA: 024J3204.
Project Information
| Project Identifiers | Project ID: 994220 DEA: 024J3204 EFIS: 0223000012 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS/SIS-96-0/105.82 |
| Award Date | 08/01/2022 |
| Closeout Date | 08/10/2023 |
| Work Description | Remove and dispose of hazard trees, replace burnt wood posts, replace damaged culverts, install system hardening components (drainage, slopes, etc.) repair/replace damaged pavement, repair bridge damage and other miscellaneous associated items of work. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/14/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nicole.mallory@dot.ca.gov | Nicole Mallory | Resident Engineer | Caltrans RE DB |
| jacob.back@dot.ca.gov | Jacob Back | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-11-10-30 | 11/10/2022 | 11/14/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-11-10-29 | 11/10/2022 | 11/14/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-11-10-28 | 11/10/2022 | 11/14/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-11-10-27 | 11/10/2022 | 11/14/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-11-10-19 | 11/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2022-11-10-18 | 11/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2022-11-10-17 | 11/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2022-11-10-16 | 11/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
