Project Details
This page displays current information for project DEA: 032H4504.
Project Information
| Project Identifiers | Project ID: 994161 DEA: 032H4504 EFIS: 0317000113 |
|---|---|
| DIST-CO-RTE-PM | 03-YOL,SOL-505-R10.6/0.0 |
| Award Date | 09/21/2022 |
| Closeout Date | 08/10/2023 |
| Work Description | INSTALL STEEL COLUMN CASINGS & REINFORCED CONC BLOCKING. |
| Location Description | YOLO AND SOLANO COUNTIES NEAR WINTERS AT PUTAH CREEK BRIDGE |
| QA Service Level | 1 (Verified on 08/05/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| masoud.saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
| brent_bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-03-27-45 | 03/27/2023 | 03/27/2023 | Quality Assurance | Concrete | View |
| 2023-03-27-44 | 03/27/2023 | 03/27/2023 | Quality Assurance | Concrete | View |
| 2023-03-24-39 | 03/24/2023 | 03/24/2023 | Quality Assurance | Concrete | View |
| 2023-03-24-38 | 03/24/2023 | 03/24/2023 | Quality Assurance | Concrete | View |
| 2023-03-24-37 | 03/24/2023 | 04/24/2023 | Quality Assurance | Concrete | View |
| 2023-03-23-30 | 03/23/2023 | 03/23/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
