Project Details
This page displays current information for project DEA: 040J6314.
Project Information
| Project Identifiers | Project ID: 994120 DEA: 040J6314 EFIS: 0421000252 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-12-21.2/22.6 |
| Award Date | 09/27/2022 |
| Closeout Date | 01/09/2025 |
| Work Description | ROADWAY RESURFACING, INSTALL DRAINAGE SYSTEM, MIDWEST GUARDRAIL SYSTEM |
| Location Description | SOLANO COUNTY NEAR RIO VISTA FROM MCCLOSKY ROAD TO 0.1 MILE WEST OF AZEVEDO ROAD |
| QA Service Level | 1 (Verified on 09/13/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| noel.aquino@dot.ca.gov | Noel Aquino | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-11-83 | 08/11/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-10-76 | 08/10/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-10-75 | 08/10/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-09-85 | 08/09/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-08-80 | 08/08/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-09-23-26 | 09/23/2023 | 09/23/2023 | Quality Assurance | Soil | View |
| 2023-08-17-76 | 08/17/2023 | 08/17/2023 | Quality Assurance | Aggregate | View |
| 2023-08-17-75 | 08/17/2023 | 08/17/2023 | Quality Assurance | Aggregate | View |
| 2023-08-17-74 | 08/17/2023 | 08/17/2023 | Quality Assurance | Aggregate | View |
| 2023-08-17-73 | 08/17/2023 | 08/17/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
