Project Details
This page displays current information for project DIME:994101.
Project Information
| Project Identifiers | Project ID: 994101 Permit Numbers: 1121NUJ0319 11226DP0462 |
|---|---|
| DIST-CO-RTE-PM | 11---12.17/12.74 |
| Award Date | 09/01/2021 |
| Closeout Date | Not set |
| Work Description | 1. POSTMILE: SD 12.17INTERSECTION OF CAMINO DEL REY AND SR-76OPEN CUT PIT AT BEND NEAR THOROUGHBRED ROAD AND CIPP THE EXISTING 12-INCH VITRIFIED CLAY PIPE A TOTAL940 FT DOWNSTREAM WITHIN CALTRANS ROW AND INSTALL 12-INCH PRIMUS LINE INSIDE OF CIPP LINED PIPE.2. POSTMILE: SD 12.36SR-76/OLD MISSION RO |
| Location Description | ROUTE 76, BONSALL |
| QA Service Level | 1 (Verified on 09/14/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ralph.w.yanzon@dot.ca.gov | Ralph Yanzon | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
