Project Details
This page displays current information for project DEA: 081C7204.
Project Information
| Project Identifiers | Project ID: 994068 DEA: 081C7204 EFIS: 0813000003 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-R96.1/R124.3 |
| Award Date | 08/02/2022 |
| Closeout Date | 02/23/2024 |
| Work Description | IMPORTED BORROW, SHOULDER BACKING, AND STRUCTURAL CONCRETE. |
| Location Description | SAN BERNARDINO ABOUT 22 MILES NORTHEAST OF BARSTOW AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF HARVARD ROAD OVERCROSSING TO 0.1 MILE NORTH OF RASOR ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 09/30/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 63 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-07-03-23 | 07/03/2023 | 07/03/2023 | Quality Assurance | Aggregate | View |
| 2023-06-09-17 | 06/09/2023 | 06/12/2023 | Quality Assurance | Concrete | View |
| 2023-06-09-5 | 06/09/2023 | 06/09/2023 | Quality Assurance | Aggregate | View |
| 2023-06-02-27 | 06/02/2023 | 06/06/2023 | Quality Assurance | Concrete | View |
| 2023-06-02-24 | 06/02/2023 | 06/02/2023 | Quality Assurance | Aggregate | View |
| 2023-05-24-54 | 05/24/2023 | 05/24/2023 | Quality Assurance | Aggregate | View |
| 2023-05-24-24 | 05/24/2023 | 05/25/2023 | Quality Assurance | Concrete | View |
| 2023-05-09-42 | 05/09/2023 | 05/10/2023 | Quality Assurance | Concrete | View |
| 2023-05-09-35 | 05/09/2023 | 05/09/2023 | Quality Assurance | Aggregate | View |
| 2023-04-11-17 | 04/11/2023 | 04/11/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
