Project Details
This page displays current information for project DEA: 120T8504.
Project Information
| Project Identifiers | Project ID: 993909 DEA: 120T8504 EFIS: 1222000108 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA/ORA-5,22,405-42.0/42.0, 10.43/10.43, .95/.95 |
| Award Date | 05/23/2022 |
| Closeout Date | 12/02/2022 |
| Work Description | Remove the old failed joint assembly units placing new steel joint assembly units, place trafficrated steel plates over the failed joint assembly units |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/26/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| christopher.blanco@dot.ca.gov | Christopher Blanco | Resident Engineer | Caltrans RE DB |
| jason.kim@dot.ca.gov | Jason Kim | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods