Project Details
This page displays current information for project DEA: 051C4104.
Project Information
| Project Identifiers | Project ID: 993817 DEA: 051C4104 EFIS: 0512000139 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-154-R2.6/R2.6 |
| Award Date | 01/18/2023 |
| Closeout Date | Not set |
| Work Description | ALAMO PINTADO PED BRIDGE |
| Location Description | SANTA BARBARA COUNTY NEAR LOS OLIVOS AT ALAMO PINTADO CREEK PEDESTRIAN BRIDGE |
| QA Service Level | 1 (Verified on 05/23/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.cooper@dot.ca.gov | David Cooper | Resident Engineer | Caltrans RE DB |
| jose.fabian.velasco.diaz@dot.ca.gov | Fabian Velasco | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-07-05-3 | 07/05/2023 | 07/06/2023 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2023-05-22-67 | 05/22/2023 | 05/31/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
