Project Details
This page displays current information for project DEA: 081H8204.
Project Information
| Project Identifiers | Project ID: 993608 DEA: 081H8204 EFIS: 0817000138 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15,138-R21.6,R14.8/R15.1 |
| Award Date | 08/26/2022 |
| Closeout Date | 03/28/2024 |
| Work Description | SIGNAL AND LIGHTING SYSTEM, HMA, JPCP, AND ROADWAY EXCAVATION. |
| Location Description | SAN BERNARDINO COUNTY IN PHELAN ON ROUTE 138 FROM 0.3 MILE WEST OF ROUTE 138/15 SEPARATION TO ROUTE 138/15 SEPARATION AND ON ROUTE 15 SOUTHBOUND EXIT RAMP AT ROUTE 138 |
| QA Service Level | 1 (Verified on 11/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| vu.thanh.nguyen@dot.ca.gov | Vu Thanh Nguyen | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-10-19-92 | 10/19/2023 | 10/24/2023 | Verification | Asphalt Binder | View |
| 2023-10-03-103 | 10/03/2023 | 10/04/2023 | Department Acceptance | Concrete | View |
| 2023-10-19-26 | 10/19/2023 | 10/24/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-25-50 | 09/25/2023 | 09/26/2023 | Department Acceptance | Concrete | View |
| 2023-08-03-70 | 08/03/2023 | 08/07/2023 | Per Request | Asphalt Binder | View |
| 2023-08-03-49 | 08/03/2023 | 08/07/2023 | Verification | Aggregate | View |
| 2023-08-03-42 | 08/03/2023 | 08/07/2023 | Production Start-Up | Hot Mix Asphalt | View |
| 2023-06-23-65 | 06/23/2023 | 06/27/2023 | Per Request | Asphalt Binder | View |
| 2023-06-23-41 | 06/23/2023 | 07/06/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-06-23-38 | 06/23/2023 | 06/24/2023 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
