Project Details
This page displays current information for project DEA: 020H5704.
Project Information
| Project Identifiers | Project ID: 993580 DEA: 020H5704 EFIS: 0215000052 |
|---|---|
| DIST-CO-RTE-PM | 02-MOD-139-R3.5/30.3 |
| Award Date | 11/10/2022 |
| Closeout Date | 05/06/2024 |
| Work Description | MODOC 139 DRAINAGE - DRAINAGE REHABILITATION |
| Location Description | IN MODOC COUNTY AT VARIOUS LOCATIONS FROM 1.2 MILES NORTH OF HOWARDS GULCH BRIDGE TO 0.1 MILE SOUTH OF CLEAR LAKE ROAD. |
| QA Service Level | 1 (Verified on 03/02/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joel.gasik@dot.ca.gov | Joel Gasik | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 60 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-07-05-11 | 07/05/2023 | 07/05/2023 | Quality Control | Concrete | View |
| 2023-06-29-13 | 06/29/2023 | 06/29/2023 | Quality Control | Concrete | View |
| 2023-06-27-38 | 06/27/2023 | 06/27/2023 | Quality Control | Concrete | View |
| 2023-06-23-11 | 06/23/2023 | 06/23/2023 | Quality Control | Concrete | View |
| 2023-06-21-10 | 06/21/2023 | 06/21/2023 | Quality Control | Concrete | View |
| 2023-06-19-2 | 06/19/2023 | 06/19/2023 | Quality Control | Concrete | View |
| 2023-06-16-14 | 06/16/2023 | 06/16/2023 | Quality Control | Concrete | View |
| 2023-06-14-16 | 06/14/2023 | 06/14/2023 | Quality Control | Concrete | View |
| 2023-05-25-18 | 05/25/2023 | 05/25/2023 | Quality Control | Concrete | View |
| 2023-05-24-15 | 05/24/2023 | 05/24/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
