Project Details
This page displays current information for project DEA: 120R2004.
Project Information
Project Identifiers | Project ID: 993511 DEA: 120R2004 EFIS: 1218000065 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-0.0/2.0 |
Award Date | 04/14/2022 |
Closeout Date | 06/19/2024 |
Work Description | PLACE PRECAST CONCRETE PAVEMENT AND REPLACE CONCRETE SLAB. |
Location Description | ORANGE COUNTY IN SAN CLEMENTE FROM ORANGE COUNTY LINE TO 0.4 MILE NORTH OF EL CAMINO REAL UNDERCROSSING |
QA Service Level | 1 (Verified on 01/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mona.shahidi@dot.ca.gov | Mona Shahidi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 57 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-21-41 | 04/21/2023 | 04/21/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-24-76 | 04/24/2023 | 04/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-21-35 | 04/21/2023 | 04/25/2023 | Per Request | Asphalt Rubber Binder | View |
2023-04-24-11 | 04/24/2023 | 04/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-21-21 | 04/21/2023 | 04/25/2023 | Verification | Aggregate | View |
2023-01-25-48 | 01/25/2023 | 01/26/2023 | Quality Control | Concrete | View |
2023-01-24-26 | 01/24/2023 | 01/25/2023 | Quality Control | Concrete | View |
2023-01-20-47 | 01/20/2023 | 01/23/2023 | Quality Control | Concrete | View |
2023-01-19-55 | 01/19/2023 | 01/20/2023 | Quality Control | Concrete | View |
2023-01-18-31 | 01/18/2023 | 01/19/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods