Project Details
This page displays current information for project DEA: 040K8004.
Project Information
| Project Identifiers | Project ID: 993454 DEA: 040K8004 EFIS: 0416000141 COOP: 042892 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-13.7 |
| Award Date | 02/05/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT ROUNDABOUT, CURB RAMPS AND SW, SIGNAL AND LIGHTING SYSTEMS. |
| Location Description | MARIN COUNTY IN SAN RAFAEL AT FREITAS PARKWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dawit.habteselassie@dot.ca.gov | Dawit Habteselassie | Resident Engineer | Caltrans RE DB |
| jeremy.light@dot.ca.gov | Jeremy Light | Structural Representative | Caltrans SR DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-05-49 | 09/05/2025 | 09/05/2025 | Quality Assurance | Aggregate | View |
| 2025-08-27-47 | 08/27/2025 | 08/27/2025 | Quality Assurance | Aggregate | View |
| 2025-08-27-45 | 08/27/2025 | 08/27/2025 | Quality Assurance | Aggregate | View |
| 2025-08-27-44 | 08/27/2025 | 08/27/2025 | Quality Assurance | Aggregate | View |
| 2025-08-28-33 | 08/28/2025 | 08/28/2025 | Quality Assurance | Aggregate | View |
| 2025-08-05-74 | 08/05/2025 | 08/05/2025 | Quality Assurance | Aggregate | View |
| 2025-08-04-48 | 08/04/2025 | 08/04/2025 | Quality Assurance | Soil | View |
| 2025-07-25-41 | 07/25/2025 | 07/25/2025 | Quality Assurance | Soil | View |
| 2025-07-22-22 | 07/22/2025 | 07/22/2025 | Quality Assurance | Soil | View |
| 2025-07-08-40 | 07/08/2025 | 07/17/2025 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
