Project Details
This page displays current information for project DEA: 120J34U4.
Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| adrian.wu@dot.ca.gov | Adrian Wu | Resident Engineer | Caltrans RE DB |
| Yong.Gyun.Park@dot.ca.gov | Yong Gyun Park | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 1413 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-12-52 | 11/12/2025 | 11/14/2025 | Quality Control | Precast Concrete | View |
| 2025-11-13-36 | 11/13/2025 | 11/14/2025 | Quality Control | Concrete | View |
| 2025-10-16-49 | 10/16/2025 | 10/23/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-08-28-79 | 08/28/2025 | 08/29/2025 | Quality Control | Concrete | View |
| 2025-07-11-68 | 07/11/2025 | 07/12/2025 | Quality Control | Concrete | View |
| 2025-07-09-127 | 07/09/2025 | 07/10/2025 | Quality Control | Concrete | View |
| 2025-07-09-126 | 07/09/2025 | 07/10/2025 | Quality Control | Concrete | View |
| 2025-07-09-125 | 07/09/2025 | 07/10/2025 | Quality Control | Aggregate | View |
| 2025-06-20-107 | 06/20/2025 | 06/21/2025 | Quality Control | Concrete | View |
| 2025-06-07-12 | 06/07/2025 | 06/08/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
