Project Details
This page displays current information for project DEA: 120J34U4.
Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| vvaldovinos@fountainheadcorp.com | Victor Valdovinos | Resident Engineer | Caltrans RE DB |
| Yong.Gyun.Park@dot.ca.gov | Yong Gyun Park | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 1647 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-02-09-77 | 02/09/2026 | 02/10/2026 | Quality Control | Aggregate | View |
| 2026-02-09-76 | 02/09/2026 | 02/10/2026 | Quality Control | Concrete | View |
| 2026-02-06-75 | 02/06/2026 | 02/07/2026 | Quality Control | Concrete | View |
| 2026-02-06-74 | 02/06/2026 | 02/07/2026 | Quality Control | Aggregate | View |
| 2026-01-23-45 | 01/23/2026 | 01/24/2026 | Quality Control | Aggregate | View |
| 2026-01-23-44 | 01/23/2026 | 01/24/2026 | Quality Control | Concrete | View |
| 2026-01-28-73 | 01/28/2026 | 01/29/2026 | Quality Control | Concrete | View |
| 2026-01-28-72 | 01/28/2026 | 01/29/2026 | Quality Control | Aggregate | View |
| 2026-01-26-58 | 01/26/2026 | 01/27/2026 | Quality Control | Concrete | View |
| 2026-01-26-57 | 01/26/2026 | 01/27/2026 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
