Project Details
This page displays current information for project DEA: 11264104.
Project Information
| Project Identifiers | Project ID: 993317 DEA: 11264104 EFIS: 1116000045 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-8-2.2 |
| Award Date | 12/15/2021 |
| Closeout Date | 09/14/2023 |
| Work Description | REPLACE BRIDGE PORTIONS & PLACE STRUCTURAL CONCRETE BRIDGE & BARRIER. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO AT E8-S163 CONNECTOR OVERCROSSING |
| QA Service Level | 1 (Verified on 10/27/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| genaro.genel@dot.ca.gov | Genaro Genal | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-04-26-62 | 04/26/2022 | 04/26/2022 | Quality Control | Concrete | View |
| 2022-04-13-78 | 04/13/2022 | 04/13/2022 | Quality Control | Concrete | View |
| 2022-04-25-44 | 04/25/2022 | 04/25/2022 | Quality Control | Aggregate | View |
| 2022-04-13-77 | 04/13/2022 | 04/13/2022 | Quality Control | Aggregate | View |
| 2022-04-25-17 | 04/25/2022 | 04/25/2022 | Quality Control | Aggregate | View |
| 2022-04-13-40 | 04/13/2022 | 04/14/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
