Project Details
This page displays current information for project DEA: 074V3604.
Project Information
| Project Identifiers | Project ID: 993286 DEA: 074V3604 EFIS: 0721000138 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-59.1/60.2 |
| Award Date | 11/23/2021 |
| Closeout Date | 10/06/2022 |
| Work Description | UPGRADE EXISTING DRAINAGE SYSTEM. |
| Location Description | LOS ANGELES COUNTY AT PEARBLOSSOM FROM 121ST STREET EAST TO LONGVIEW ROAD |
| QA Service Level | 1 (Verified on 11/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| fred.tieu@dot.ca.gov | Fred Tieu | Resident Engineer | Caltrans RE DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-04-08-13 | 04/08/2022 | 04/08/2022 | Department Acceptance | Soil | View |
| 2022-04-08-12 | 04/08/2022 | 04/08/2022 | Department Acceptance | Soil | View |
| 2022-04-08-11 | 04/08/2022 | 04/08/2022 | Department Acceptance | Soil | View |
| 2022-04-06-5 | 04/06/2022 | 04/06/2022 | Department Acceptance | Soil | View |
| 2022-04-07-6 | 04/07/2022 | 04/07/2022 | Department Acceptance | Soil | View |
| 2022-04-07-5 | 04/07/2022 | 04/07/2022 | Department Acceptance | Soil | View |
| 2022-04-07-3 | 04/07/2022 | 04/07/2022 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
